CENWAT revision guide: boilers, water heaters, controls and flues
Revise CENWAT in job stages: can the appliance be installed here, supplied and flued safely, commissioned properly (gas rate, combustion checks) and controlled with full boiler interlock — and what must be proved before handover. Gas rate and heat input are the high-value method questions.