Level 3 · Plumbing revision
Cold Water revision notes
Loading-unit sizing, storage and accumulators, the Water Fittings Regulations, Legionella control and commissioning.
- 12notes with free previews
- 126questions on Premium
- 5topics
Selection & Sizing
Accumulators and boosted cold water systems
How accumulators meet short peaks and when boosted or pressurised systems are needed.
Sizing cold water pipes by loading units (BS EN 806-3)
How the BS EN 806-3 simplified method uses loading units to turn combined demand into a pipe size.
Sizing cold water storage from demand
Working stored cold water volume from demand and a reserve period, without oversizing.
Regulations, Notification & Info Sources
Design Temperatures & Materials
Commissioning, Disinfection & Faults
Commissioning and the soundness (pressure) test
The commissioning sequence and how the soundness (pressure) test proves the pipework.
Diagnosing cold water defects and handover
A systematic way to diagnose common cold water faults and hand the system over.
Flushing and disinfection (PD 855468 overview)
An overview of flushing and disinfecting a cold water system to PD 855468 principles.
Legionella Control & Maintenance
More plumbing modules
Every module has its own revision notes and question bank.