How pipe size, fall and appliance type set the unventilated branch length before a separate vent is needed.
Approved Document H gives branch layouts that need no separate vent when their length and fall fit Table 2 or Diagram 3. A branch running full can pull water out of its own trap (self-siphonage), so read the appliance, pipe size, length and fall together:
- Washbasins (32 mm pipe): Keep an unvented branch at 1.7 metres or shorter. Read its fall from the design curve: the longer the run, the flatter it must be, so at 1.7 m it falls about 18 to 22 mm per metre (roughly 1 in 55 to 1 in 45).
- Sinks, baths and showers (40 mm pipe): An unvented 40 mm waste can be up to 3.0 metres long, at a fall of 1 in 55 to 1 in 11.
- Water closets (100 mm pipe): A single WC may have up to 6.0 metres of unvented branch to the stack. Give it at least 18 mm fall per metre (about 1 in 55). The flatter 9 mm per metre (about 1 in 110) provision is for a long branch serving more than one WC where space is tight.
These limits go with the pipe sizes and falls above. For a longer basin run, 40 mm pipe can reach 3.0 m, or 50 mm pipe 4.0 m, without a separate vent if the fall stays between 18 and 44 mm per metre. For a sink or bath, 50 mm pipe can reach 4.0 m at a fall between 18 and 90 mm per metre. A shared 100 mm branch can serve up to eight WCs with outlets over 80 mm along 15 m (Table 2, subject to its fall rules), but that figure is for a shared branch, not the single WC above.
If the planned run falls outside these sizes and falls, choose a compliant layout or ventilate the branch: to outside air, to a ventilating stack, or with a suitable air admittance valve (AAV). A vent protects the trap seal, but it does not make a pipe that is too flat drain properly. A branch ventilating pipe serving one appliance is at least 25 mm in diameter, or at least 32 mm where the branch is longer than 15 m or has more than five bends. Where it runs straight to outside air, it finishes at least 900 mm above any opening into the building within 3 m.
Joining branch pipes
Where two branch pipes of about the same size meet, use a swept entry of 25 mm radius, or a 45° junction. A branch of 75 mm or more entering a stack of the same size needs a sweep of at least 50 mm radius, or 45°. A small branch, up to 40 mm, joining a branch of 100 mm or more should enter the upper part of the larger pipe's wall where it can, so that its outlet sits above the flow along the bottom. Avoid bends in branch pipes where you can, and give any you need as large a radius as possible.
A branch pipe discharges into another branch pipe or a discharge stack. On the ground floor, a pipe carrying only wastewater may discharge to a gully instead. Branch pipes should not discharge into open hoppers, as many older upstairs wastes did.
Sizing the stack
A discharge stack is at least as large as the largest trap or branch pipe connected to it, and it does not reduce in the direction of flow. Approved Document H's minimums are 50 mm for a stack serving urinals, 75 mm for one serving a WC with an outlet under 80 mm, and 100 mm where a WC's outlet is larger. A 75 mm stack takes one such WC at most, and a 50 mm or 65 mm stack takes no WC at all.
Trap seal depths by appliance
Approved Document H also sets how much water seal each trap should start with, in Table 1. A deeper seal resists a bigger pressure difference across the trap. What counts is the height of the water barrier, not the volume of water in the trap, and the branch still needs suitable design and ventilation.
- Washbasins, bidets, sinks, urinal bowls, food waste disposal units, washing machines and dishwashers: 75 mm seal.
- For a spray-tap washbasin with a flush-grated waste and no plug, Table 1 permits a 50 mm initial seal. The exception needs all of those features together.
- Baths and showers: 50 mm seal.
- WC pans: 50 mm seal, whatever the outlet size.
- A bath, shower, washing machine or dishwasher that discharges directly to a gully may have a shallower seal, but never less than 38 mm.
- Under working and test conditions a water-sealed trap must still retain at least 25 mm of seal. The guidance also permits an equivalent barrier; an approved membrane waste valve must suit its particular application. The 25 mm figure is what must remain, not the depth a trap starts with.
Jointing plastic waste pipe
Small-diameter waste is usually solvent welded. Marley's installation data says a solvent-welded run needs an expansion coupling wherever a pipe length exceeds 2 m or between fixed points, and the same principle applies to its polypropylene push-fit waste. Polypropylene cannot be solvent welded at all; it is joined with push-fit fittings. Marley's table supports 32 mm and 40 mm waste at no more than 0.5 m centres horizontally and 1.2 m vertically. Its PVC-U and polypropylene waste systems must not be run outside unless they are painted, because ultraviolet light degrades them.
Wavin's soil and waste manual adds its own points. Its PVC-U soil and ABS solvent weld waste are rated for intermittent discharges of water up to 90 °C, and its polypropylene push-fit waste and V-joint traps up to 100 °C; its solvent weld overflow must not be used where hot water may be discharged. A pipe cut on site is cut square, deburred and chamfered, so that the sealing ring of a ring-seal or push-fit joint is not pushed out of place as the spigot goes in. The pipes can be painted, oil-based gloss being the most suitable, after the surface is lightly sanded and cleaned. Pipes fixed to fascias treated with timber preservative go up only once the preservative has dried out. Cold weather lowers the impact strength of plastics, so handle them with extra care in winter, lifting with nylon slings rather than metal chains or hooks. Stack loose lengths no more than 7 layers or 2 m high, with socketed pipe laid sockets at alternate ends.
Boiler condensate into a waste pipe
A condensing boiler's condensate may drain into the sanitary pipework. Approved Document H asks for pipework of at least 22 mm diameter and a 75 mm condensate trap; where a second trap outside the boiler provides that seal, leave an air gap between the boiler and that trap. The preferred connection is an internal stack. Where the condensate joins a branch pipe instead, make the connection further along the branch than any sink waste, never ahead of it. Condensate is acidic, so every pipe it runs into must withstand a pH of 6.5 or lower, and the installation follows BS 6798.