PlumbRevise
CPA1

Flue integrity check and the commissioning order

Note 7 of 15 · free preview · full note on Premium

Air inlet readings, visual flue checks, the 20.6% oxygen limit, the TB 143 commissioning order and the meaning of net flue temperature.

Why the check exists

Read the full Combustion Performance Analysis note with Premium

You’re reading the free preview. PlumbRevise Premium unlocks the complete write-up, the worked detail for every Combustion Performance Analysis note — plus timed tests on every module.

Plenty of modules are free to read in full.