Sizing a sealed-system expansion vessel from the system volume, the expansion factor and the acceptance factor.
Expansion and usable capacity
The gas cushion in a diaphragm vessel compresses as heated system water expands. The vessel must accept that expansion while keeping the hot operating pressure within the permitted range below the relief-valve setting. Too little usable capacity can cause discharge, so a discharge does not mean the diaphragm has failed.
Keep the pressures separate
- Gas pre-charge: the specified starting gas pressure with the water side depressurised. The manufacturer’s setting accounts for static head and any required margin.
- Cold water fill: the pressure used to fill the circuit. It may be higher than pre-charge to hold a cold-water reserve in the vessel.
- Maximum working pressure: the permitted final pressure, allowing the required margin below the relief setting.
Use absolute pressures in gas-volume calculations. At approximately 1 bar atmospheric pressure, add 1 bar to a gauge reading. Do not put gauge values straight into the pressure ratio.
A simplified calculation
The basic relationship illustrates why vessel capacity exceeds the water’s expansion:
- Expansion volume Ve = system volume × expansion factor.
- With no initial water reserve, the available fraction is AF = 1 − (Pi/Pf), using the initial and final absolute gas pressures.
- The theoretical vessel volume is Ve/AF.
The expansion factor depends on the fluid and its cold and maximum design temperatures; 4% is an exercise assumption, not a constant for every heating circuit. Glycol can change it. A real selection also accounts for the specified reserve, pre-charge/fill relationship, vessel location and any existing appliance vessel.
Worked example
Assume 120 L, a 0.04 expansion factor and no initial water reserve. Ve = 120 × 0.04 = 4.8 L.
Take initial gas pressure 1.0 bar gauge = 2.0 bar absolute and final working pressure 2.5 bar gauge = 3.5 bar absolute. This example leaves 0.5 bar below a 3 bar relief setting. AF = 1 − (2.0/3.5) = 0.429, giving 4.8/0.429 = 11.2 L.
A nominal 12 L vessel exceeds this simplified result, but that is not yet the final installation size. Apply the manufacturer’s full sizing method, including any cold-water reserve and its required relief margin, before selecting the next suitable available vessel. Check and record the pre-charge and fill settings at commissioning.