The Building Regulations Approved Documents and British Standards that govern central heating design and installation.

Building Regulations

For heating work in England, the Building Regulations set the applicable legal duties and Approved Document L gives practical guidance on energy efficiency, controls and commissioning. It is a recognised compliance route, not the legislation itself. Wales has its own Approved Documents; Scotland and Northern Ireland also use their own requirements and guidance.

Other Approved Documents apply to parts of the job:

  • Approved Document J — combustion appliances and flueing for the heat source.
  • Approved Document G — hot water safety, including unvented cylinders.
  • Approved Document P — electrical safety of the wiring and controls.

Supporting compliance guidance

For England’s 2021 regime, relevant dwelling-services guidance is incorporated in Approved Document L Volume 1. The older Domestic Building Services Compliance Guide belongs to the earlier regime; do not substitute its values for the edition applicable to the work.

British Standards

Recognised British Standards underpin good practice: boiler installation standards, the standard for flushing and water treatment, the guidance for expansion vessels and sealed systems, and heating system design standards. They are not law in themselves but demonstrate competent practice and are widely referenced by manufacturers and assessors.

Two of those standards come up often by name: BS 6798:2014 covers specified gas-boiler activities up to 70 kW net rated input. BS 7593:2019+A1:2024 addresses preparation, commissioning and ongoing care of domestic heating and cooling water systems, including cleaning, treatment and in-line filtration.

Why it matters

Designing and installing to these documents keeps the work compliant, safe and notifiable through the correct route. Identify the nation, work type and applicable regulatory edition, including transition provisions; a newly published edition may not yet be in force for the project.

England’s Approved Document L 2021: the key figures

A few figures in Approved Document L decide how a Level 3 heating design is specified. They come on top of the general duty to provide efficient controls and commission the system.

  • A gas boiler serving radiators or underfloor heating in an existing dwelling should reach at least 92% efficiency, as defined by the ErP directive. The lower SEDBUK 2009 figures, 78% for natural gas and 80% for LPG, apply only in the exceptional circumstances set out in the condensing boiler installation assessment procedure.
  • For a new wet system, or a complete replacement of the appliance, emitters and pipework, size the whole circuit to heat the dwelling with a flow temperature of 55°C or lower. If that is genuinely infeasible, for example because larger radiators cannot fit, design for the lowest flow temperature that still meets the load. That may be above 55°C.
  • A new dwelling with a floor area of 150 square metres or more needs at least two independently controlled heating circuits, not just one for the whole home.
  • Replacing a heat generator such as a boiler in an existing dwelling brings in thermostatic room controls for each heated room, not only for the zone as a whole. The exceptions are where this is not technically feasible, for example in a dwelling with very low heat demand, or where the guidance’s justified zone-control provisions apply.
  • Installing a replacement gas combination boiler in an existing dwelling also needs at least one further efficiency measure: flue gas heat recovery, weather compensation, load compensation, or a smart thermostat with automation and optimisation.

Where a boiler or full system replacement is notifiable work, a Gas Safe registered installer normally self-certifies it through a Competent Person Scheme. No separate building notice is then needed.